Case
0531-88112339
0531-88112337
ztny@vip.163.com
Case Work
Indonesia 2x280t/h high pressure CFB project (for PT. PUPUK KALTIM)
  • Case Name:Indonesia 2x280t/h high pressure CFB project (for PT. PUPUK KALTIM)
  • Case Category:Case Work
> Contact Us
  • Overview
  • Parameters
New project-2x280t / h high pressure circulating fluidized bed boiler (CFB), engineering design uses ASME technical standards, and KKS coding system. Project was put into operation in early 2013.
 
Circulating fluidized bed boiler(CFB): UG-280/9.8-M, 9.8MPa, 540 ℃, Wuxi Huaguang Boiler
 
济南网站建设 济南网站制作 网站建设 网站制作
_×